|本期目录/Table of Contents|

[1]诸国华 马网扣.SJ350型自升式钻井平台总体性能分析[J].中国海上油气,2020,32(01):157-164.[doi:10.11935/j.issn.1673-1506.2020.01.019]
 ZHU Guohua MA Wangkou.Analysis on the general performance of SJ350 jack-up drilling unit[J].China Offshore Oil and Gas,2020,32(01):157-164.[doi:10.11935/j.issn.1673-1506.2020.01.019]
点击复制

SJ350型自升式钻井平台总体性能分析()

《中国海上油气》[ISSN:1673-1506/CN:11-5339/TE]

卷:
第32卷
期数:
2020年01期
页码:
157-164
栏目:
海洋工程
出版日期:
2020-01-15

文章信息/Info

Title:
Analysis on the general performance of SJ350 jack-up drilling unit
文章编号:
1673-1506(2020)01-0157-08
作者:
诸国华1 马网扣2
(1. 中国船舶及海洋工程设计研究院 上海 200011; 2. 中船邮轮科技发展有限公司 上海 200137)
Author(s):
ZHU Guohua1 MA Wangkou2
(1. Marine Design & Research Institute of China, Shanghai 200011, China; 2. CSSC Cruise Technology Development Co. Ltd., Shanghai 200137, China)
关键词:
SJ350 自升式钻井平台 总体性能 风洞试验 水池试验
Keywords:
SJ350 jack-up drilling unit general performance wind tunnel test water tank test
分类号:
U664.381
DOI:
10.11935/j.issn.1673-1506.2020.01.019
文献标志码:
A
摘要:
SJ350型钻井平台是我国自主研发的最大作业水深350英尺(106.68 m)的高规格自升式钻井平台。本文详细阐述了SJ350的主尺度和总体布置,进行了设计环境条件、拖航稳性、抗倾稳性、拖航海况限制条件、插桩性能等关键总体性能的分析校核,并开展了风洞试验及水池试验,结果表明SJ350的主要技术性能指标达到或超过了同类型国际主流品牌船型。目前该船型的基本设计已通过ABS审查认证。本文研究成果可为该船的稳定性及运动性能评估、结构优化设计等提供参考依据。
Abstract:
SJ350 drilling unit is a high-standard jack-up drilling unit independently developed by China with the maximum operating water depth of 350 feet(106.68 m). In this paper, the main dimension and general arrangement of SJ350 were elaborated in details, and key general performance including design environmental conditions, towing stability, overturning stability, restrictive sea conditions for towing, leg penetration performance, etc. were analyzed and checked. Besides, the wind tunnel test and pool experiment were carried out as well. The results show that the principal technical performance indices of SJ350 have reached or exceeded those of similar international mainstream brand ship types. Currently, the basic design of SJ350 has already been approved and certified by ABS. The research achievements of this paper can provide references for the stability and motion performance evaluation of SJ350, the optimized structural design and so on.

参考文献/References:

[1] 王懿,臧孟,宋林松,等.双层土中自升式钻井平台桩靴极限拔桩阻力计算新方法[J].中国海上油气,2018,30(5):141-148.DOI:10.11935/j.issn.1673-1506.2018.05.018. WANG Yi,ZANG Meng,SONG Linsong,et al.A new method for calculating the ultimate spudcan uplift resistance of jack-up drilling rig in double-layer soil [J].China Offshore Oil and Gas,2018,30(5):141-148.DOI:10.11935/j.issn.1673-1506.2018.05.018.
[2] 王冬石,袁烨,徐文祥,等.非连续压载下黏土层中桩靴承载力变化规律[J].中国海上油气,2018,30(5):149-154.DOI:10.11935/j.issn.1673-1506.2018.05.019. WANG Dongshi,YUAN Ye,XU Wenxiang,et al.Variation of bearing capacity of large spudcan in clay layer under discontinuous ballasting[J].China Offshore Oil and Gas,2018,30(5):149-154.DOI:10.11935/j.issn.1673-1506.2018.05.019.
[3] 金晓剑,陈荣旗,朱晓环.南海深水陆坡区油气集输的重大挑战与技术创新:荔湾3-1深水气田及周边气田水下及水上集输工程关键技术[J].中国海上油气,2018,30(3):157-163.DOI:10.11935/j.issn.1673-1506.2018.03.021. JIN Xiaojian,CHEN Rongqi,ZHU Xiaohuan.Major challenges and technical innovations of oil & gas gathering and transporting for the deep water continental slope in the South China Sea:key technology of subsea and overwater gathering and transporting project of Liwan 3-1 deep water gas field & its surroundings [J].China Offshore Oil and Gas,2018,30(3):157-163.DOI:10.11935/j.issn.1673-1506.2018.03.021.
[4] 陈宏.当今国际自升式钻井平台设计与建造市场的竞争态势[J].海洋石油,2012,32(1):97-102. CHEN Hong.Current worldwide competitive status of jackup design and construction[J].Offshore Oil,2012,32(1):97-102.
[5] 张鹏飞,于兴军,栾苏,等.自升式钻井平台的技术现状和发展趋势[J].石油机械,2015,43(3):55-59. ZHANG Pengfei,YU Xingjun,LUAN Su,et al.Current tecnnologies and future development of jack-up rig[J].China Petroleum Machinery,2015,43(3):55-59.
[6] 张勇,马网扣,刘晓明.深水自升平台设计的三项基础技术研究[J].船舶,2010,21(2):7-14. ZHANG Yong,MA Wangkou,LIU Xiaoming.Three basic technical researches on deep-sea self-elevated units[J].Ship & Boat,2010,21(2):7-14.
[7] 李红涛,徐捷,李晔.自升式海洋平台站立状态下的性能分析[J].中国海洋平台,2009,24(4):38-42. LI Hongtao,XU Jie,LI Ye.Study on general performance of jack-up under elevated condition[J].China Offshore Platform,2009,24(4):38-42.
[8] 郑喜耀.自升式钻井平台插桩深度计算及几个问题的探讨[J].中国海上油气(工程),2000,12(2):18-21. ZHENG Xiyao.Calculation of jack-up drilling platform leg penetration and some discussions[J].China Offshore Oil and Gas(Engeering),2000,12(2):18-21.
[9] 国家能源局.SY/T 6707—2016 海洋井场调查规范[S].北京:石油工业出版社,2016.
[10] 陈刚,汪怡,黄曌宇.自升式钻井平台风载荷试验研究[J].船舶工程,2012,34(2):74-75,83. CHEN Gang,WANG Yi,HUANG Zhaoyu.Experimental research of wind loads for the jack-up drilling unit[J].Ship Engineering,2012,34(2):74-75,83.
[11] 林一,胡安康,熊飞.自升式钻井平台风载荷数值模拟与实验研究[J].水动力学研究与进展A辑,2012,27(2):208-215. LIN Yi,HU Ankang,XIONG Fei.Numerical simulation and experiment study on wind load of jack-up platform[J].Chinese Joural of Hydrodynamics,2012,27(2):208-215.

相似文献/References:

备注/Memo

备注/Memo:
第一作者简介: 诸国华,女,高级工程师,长期从事船舶与海洋平台设计工作。地址:上海市浦东新区浦三路858弄9号1501(邮编:200225)。E-mail:18018601501@163.com。 通信作者简介: 马网扣,男,高级工程师,2003年毕业于天津大学船舶与海洋工程专业,主要从事船舶与海洋工程科研管理和设计工作。地址:上海市浦东新区洲海路999号森兰国际大厦A座7楼(邮编:200137)。E-mail:marifem@163.com。收稿日期:2019-01-13 改回日期:2019-09-02
更新日期/Last Update: 2020-01-15